Bangkok, Thailand
![]() |
Royal Orchid Sheraton Hotel, M&E Upgrade Image courtesy of ROSH |
Client : Royal Orchid Sheraton Hotel and Towers
|
The Royal Orchid Sheraton 5 Star Hotel commissioned EEC Lincolne Scott to design, document and supervise the installation of various upgrades to their existing building services.
The works were undertaken in stages over approximately five years.
The building was opened in 1984. It consists of a basement, ground level, 3 level podium, 24 guest levels and roof. There are 750 guest rooms.
The works will ensure the Hotel’s building services can assist in maintaining its market position for at least the next 10 years. In addition, the works will improve the fire and life safety standards for the Hotel occupants and provide lifecycle cost savings.
EEC Lincolne Scott met the challenge of keeping the Hotel operational throughout the works and minimising disruption to hotel guests.
The major projects included: stair pressurisation, steam boiler replacement, PABX replacement, lift refurbishment, escalator replacement, water treatment plant upgrade, AHU replacements, cooling tower replacements, chilled water system upgrade.
..........................................................................................................................
About us
Our Story
Our Philosophy
Project Collaboration Philosophy
Delivery Strategy
Our Team
Service
Civil and Structural
Air conditioning and Ventilation
Electrical and Communications
Fire Protection
Plumbing and Hydraulics
Vertical Transportation Services
Sustainable Design Services
Building Information Modelling : BIM
Project
Showcase Our Work
List of Project
EEC LINCOLNE SCOTT CO.,LTD.
42 EEC Academy 2 Building, Soi Ram Inthra 97, Khan Na Yao, Khan Na Yao District, Bangkok 10230 Thailand.
Google Earth / Map
Tel : +66 2130 4599
Fax : +66 2130 4594
[email protected]